A renovation is not one job. It is a dozen jobs by different people, each of which can only start when the one before it is done, plus a stream of deliveries that have to arrive on the right day — not too early, because there is nowhere to put a fridge in a room without a floor, and not too late, because the fitter is booked.
The timeline below is the usual order of the work. Your renovation will skip some steps and repeat others; the order is what matters.
1. Measure, decide, and ask for quotes
Before anything is booked, know what you are doing in each room and what goes in it. Measure properly — every wall, window and doorway — and keep the measurements with the project, not on the back of an envelope.
Ask more than one contractor for a quote on the same list, so the quotes can be compared. A quote that is much cheaper usually leaves something out; read what is included before what it costs.
2. Order what takes longest
The longest wait in a renovation is often not the work but the things the work needs. Made-to-measure kitchens, worktops cut to size, built-in wardrobes, windows and some tiles can take weeks to arrive. Order them early — often before the room they belong to has been touched — and write down the delivery date you were promised.
3. Strip out and prepare
Old kitchens, floors and fittings come out; walls are opened where needed. This is when the surprises appear: wiring that has to be replaced, damp, uneven floors. Take photographs of what you find before anything is covered up again. They settle arguments later and help whoever comes next.
4. First fix — the work inside the walls
The electrician and the plumber run cables and pipes and fit the boxes and connections that will end up behind the walls and under the floors. Air conditioning ducting goes in now too. It is the work nobody sees afterwards, which is why it must be checked before the walls are closed.
5. Walls, ceilings and floors
Plastering or skimming, then ceilings, then floors and tiling. Each needs time to dry or set before the next can start, so this stage is where a timeline most often slips. Book the trades in order, and leave the drying time between them.
6. Fit out — kitchens, bathrooms, carpentry
Cabinets, worktops and wardrobes are installed, sanitaryware is fitted, carpentry is finished. This is when the deliveries ordered in step 2 must arrive — on the right day, into a room that is ready for them.
7. Second fix and paint
The electrician comes back to fit switches, sockets and lights; the plumber connects taps and appliances. Then painting, usually last, so nothing scuffs a finished wall.
8. Clean, install the furniture, hand over
A proper clean, then the loose furniture, curtains and blinds. Finally the handover: walk through every room with whoever did the work, write down what is not right, and agree when it will be fixed. Photograph each point you agree on.
What holds a timeline together
Three things, whatever you use to keep track:
- Every date in one place. Deliveries, the days things are installed, the electrician's two visits, the tiler, the deadline for the painting. A delivery date in one email and the fitter's date in another is how a fridge arrives in a room with no floor.
- Who must be there. Each visit needs someone to open the door and answer questions. Decide who, and tell them — and tell them again if it moves.
- Sign-off before the next step. A job is done when you have looked at it, not when someone says it is. Before-and-after photos and a clear "approved" stop half-finished work from being covered up by the next trade.

Where this leads
If the money is the part that worries you, start with how to set a renovation budget you can actually keep. To see how YPReno keeps deliveries, installations, appointments and task deadlines on one schedule — and in your own phone's calendar — see schedule and tasks, or start free.